Please use this identifier to cite or link to this item:
https://heritagensw.intersearch.com.au/heritagenswjspui/handle/1/10402
Type: | Conservation Management Plan |
Title: | The germination building, Thornleigh maltworks. NorthConnex archival recording / Prepared by JCIS Consultants for Lend Lease Bouygues Joint Venture (LLBJV) |
metadata.dc.contributor.corpauthor: | Prepared by JCIS Consultants for Lend Lease Bouygues Joint Venture (LLBJV) |
Description: | NorthConnex is a nine kilometre, tolled motorway link from the southern end of the M1 Pacific Motorway at Wahroonga to the Hills M2 Motorway at its existing Pennant Hills Road interchange in West Pennant Hills. NorthConnex will be the longest road tunnel project in Australia. Construction of the tunnel will begin in early 2015 and is expected to be completed in 2019. As part of the planning for NorthConnex, an Environmental Impact Statement (EIS) was prepared. This included assessment of Indigenous and Non-Indigenous Heritage (AECOM 2014A and 2014B). The Environmental Impact Statement was publicly exhibited from the 15 July 2014 to 12 September 2014 (a total of 60 days). Approval for the construction and operation of NorthConnex was granted by the NSW Minister for Planning on 13 January 2015. The conditions of consent include new and extensive safeguards for the operation of the tunnel and air quality, and include conditions regarding the impact of the project on heritage. |
Koha catalogue reference: | 13619 |
URI: | https://heritagensw.intersearch.com.au/heritagenswjspui/handle/1/10402 |
Subjects: | The Maltworks |
Appears in Collections: | Conservation Management Plan |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
H14589 - NORT.pdf | H14589 - NORT.pdf | 17.68 MB | Adobe PDF | ![]() View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.